Average Controls Engineer with Primavera P6 Skills Salary

$78,850
Avg. Base Salary (USD)

The average salary for a Controls Engineer is $78,850 in 2025

Base Salary
$0 - $79k
Total Pay
$0 - $79k
Is Average Controls Engineer with Primavera P6 Skills Salary your job title? Find out what you should be paid
Use our tool to get a personalized report on your market worth.What's this?
United States (change)
How it works:
1
Enter city & years of experience
2
Add pay factors like skills & education
3
Find your market worth with a report tailored to you
EXPLORE BY:

What Do Controls Engineers Do?

Controls Engineer Tasks
  • Plan and perform work requiring electronic and mechanical theories and principles, and writing specifications.
  • Manage the design and installation of electrical equipment including electrical power distribution systems, PLC's, instrumentation, variable speed AC and DC drives.
  • Design calculations and prepare equipment or material specifications for electrical and electronic based systems.
  • Work with the maintenance planner to schedule electrical projects.
  • Develop clear and concise operator instruction manuals.
Find your market worth – how it works:

FAQs About Controls Engineers

What is the highest pay for Controls Engineers?

Our data indicates that the highest pay for a Controls Engineer is $NaN / year

What is the lowest pay for Controls Engineers?

Our data indicates that the lowest pay for a Controls Engineer is $NaN / year

How can Controls Engineers increase their salary?

Increasing your pay as a Controls Engineer is possible in different ways. Change of employer: Consider a career move to a new employer that is willing to pay higher for your skills. Level of Education: Gaining advanced degrees may allow this role to increase their income potential and qualify for promotions. Managing Experience: If you are a Controls Engineer that oversees more junior Controls Engineers, this experience can increase the likelihood to earn more.